Construction Status

Select a Property

Imperial Dream

40/4, Nirala R/A, Khulna

Expected Completion Date

To be Announced

Status Updated

October, 2024
Imperial Dream
SL No. Name of The Work Progress Details
1 Foundation Work
100% Complete
2 Super Structure Work
100% Complete
3 Block Work
100% Complete
4 Electrical Conduiting Work
100% Complete
5 Door Frame Fitting Work
100% Complete
6 Sanitary & Plumbing Line Work (AC Drain Water Line, Verandah - Vertical Line)
100% Complete
7 In Side Plastering Work
100% Complete
8 Electrical Cable Wiring Work
100% Complete
9 Wall Tiles Work
100% Complete
10 Common Sanitary & Plumbing Line Work
100% Complete
11 Outside Plastering Work
100% Complete
12 Floor Tiles / Marble Work
100% Complete
13 L.C.C Work
100% Complete
14 Grill & Railing Work
100% Complete
15 Inside Paint & Polishing Work
100% Complete
16 Switch-Socket Fitting Work
100% Complete
17 Outside Paint Work
100% Complete
18 Door Shutter Work
100% Complete
19 Aluminum/Glazing Work
100% Complete
20 Tiles Pointing Work & Marble Finishing Work
100% Complete
21 Commode – Basin Fitting Work and C.P Fittings Work
100% Complete
22 Lift / Generator / Substation / Solar Work
100% Complete
23 Boundary Wall / Ground Floor Development Work
100% Complete
24 Roof Top Finishing Work
100% Complete
25 Roof Top Gardening Work
100% Complete

Imperial Afaraa Garden

35/5, Sonadangan R/A, Khulna

Expected Completion Date

To be Announced

Status Updated

October, 2024
Imperial Afraa Garden
SL No. Name of The Work Progress Details
1 Foundation Work
100% Complete
2 Super Structure Work
100% Complete
3 Block Work
100% Complete
4 Electrical Conduiting Work
100% Complete
5 Door Frame Fitting Work
100% Complete
6 Sanitary & Plumbing Line Work (AC Drain Water Line, Verandah - Vertical Line)
100% Complete
7 In Side Plastering Work
100% Complete
8 Electrical Cable Wiring Work
100% Complete
9 Wall Tiles Work
100% Complete
10 Common Sanitary & Plumbing Line Work
100% Complete
11 Outside Plastering Work
100% Complete
12 Floor Tiles / Marble Work
100% Complete
13 L.C.C Work
100% Complete
14 Grill & Railing Work
100% Complete
15 Inside Paint & Polishing Work
100% Complete
16 Switch-Socket Fitting Work
100% Complete
17 Outside Paint Work
100% Complete
18 Door Shutter Work
100% Complete
19 Aluminum/Glazing Work
100% Complete
20 Tiles Pointing Work & Marble Finishing Work
100% Complete
21 Commode – Basin Fitting Work and C.P Fittings Work
100% Complete
22 Lift / Generator / Substation / Solar Work
100% Complete
23 Boundary Wall / Ground Floor Development Work
100% Complete
24 Roof Top Finishing Work
100% Complete
25 Roof Top Gardening Work
100% Complete

Imperial Amman Valley

418/6 Sonadanga R/A (2nd Phase), Khulna - 9100

Expected Completion Date

To be Announced

Status Updated

October, 2024
Imperial Amman Valley
SL No. Name of The Work Progress Details
1 Foundation Work
100% Complete
2 Super Structure Work
100% Complete
3 Block Work
100% Complete
4 Electrical Conduiting Work
100% Complete
5 Door Frame Fitting Work
100% Complete
6 Sanitary & Plumbing Line Work (AC Drain Water Line, Verandah - Vertical Line)
100% Complete
7 In Side Plastering Work
100% Complete
8 Electrical Cable Wiring Work
100% Complete
9 Wall Tiles Work
100% Complete
10 Common Sanitary & Plumbing Line Work
100% Complete
11 Outside Plastering Work
80% Complete
12 Floor Tiles / Marble Work
80% Complete
13 L.C.C Work
80% Complete
14 Grill & Railing Work
80% Complete
15 Inside Paint & Polishing Work
80% Complete
16 Switch-Socket Fitting Work
80% Complete
17 Outside Paint Work
80% Complete
18 Door Shutter Work
80% Complete
19 Aluminum/Glazing Work
80% Complete
20 Tiles Pointing Work & Marble Finishing Work
80% Complete
21 Commode – Basin Fitting Work and C.P Fittings Work
50% Complete
22 Lift / Generator / Substation / Solar Work
50% Complete
23 Boundary Wall / Ground Floor Development Work
50% Complete
24 Roof Top Finishing Work
50% Complete
25 Roof Top Gardening Work
50% Complete

Imperial Park View

409/21, Nirala R/A Khulna - 9100

Expected Completion Date

To be Announced

Status Updated

October, 2024
Imperial Park View
SL No. Name of The Work Progress Details
1 Foundation Work
100% Complete
2 Super Structure Work
100% Complete
3 Block Work
100% Complete
4 Electrical Conduiting Work
100% Complete
5 Door Frame Fitting Work
100% Complete
6 Sanitary & Plumbing Line Work (AC Drain Water Line, Verandah - Vertical Line)
100% Complete
7 In Side Plastering Work
100% Complete
8 Electrical Cable Wiring Work
100% Complete
9 Wall Tiles Work
100% Complete
10 Common Sanitary & Plumbing Line Work
100% Complete
11 Outside Plastering Work
80% Complete
12 Floor Tiles / Marble Work
80% Complete
13 L.C.C Work
80% Complete
14 Grill & Railing Work
80% Complete
15 Inside Paint & Polishing Work
80% Complete
16 Switch-Socket Fitting Work
80% Complete
17 Outside Paint Work
80% Complete
18 Door Shutter Work
80% Complete
19 Aluminum/Glazing Work
80% Complete
20 Tiles Pointing Work & Marble Finishing Work
80% Complete
21 Commode – Basin Fitting Work and C.P Fittings Work
50% Complete
22 Lift / Generator / Substation / Solar Work
50% Complete
23 Boundary Wall / Ground Floor Development Work
50% Complete
24 Roof Top Finishing Work
50% Complete
25 Roof Top Gardening Work
50% Complete

Imperial Mohua

08/06 Sonadanga R/A (1st Phase)

Expected Completion Date

To be Announced

Status Updated

October, 2024
Imperial Mohua
SL No. Name of The Work Progress Details
1 Foundation Work
100% Complete
2 Super Structure Work
100% Complete
3 Block Work
100% Complete
4 Electrical Conduiting Work
100% Complete
5 Door Frame Fitting Work
100% Complete
6 Sanitary & Plumbing Line Work (AC Drain Water Line, Verandah - Vertical Line)
100% Complete
7 In Side Plastering Work
100% Complete
8 Electrical Cable Wiring Work
100% Complete
9 Wall Tiles Work
100% Complete
10 Common Sanitary & Plumbing Line Work
100% Complete
11 Outside Plastering Work
80% Complete
12 Floor Tiles / Marble Work
80% Complete
13 L.C.C Work
80% Complete
14 Grill & Railing Work
80% Complete
15 Inside Paint & Polishing Work
80% Complete
16 Switch-Socket Fitting Work
80% Complete
17 Outside Paint Work
80% Complete
18 Door Shutter Work
80% Complete
19 Aluminum/Glazing Work
80% Complete
20 Tiles Pointing Work & Marble Finishing Work
80% Complete
21 Commode – Basin Fitting Work and C.P Fittings Work
50% Complete
22 Lift / Generator / Substation / Solar Work
50% Complete
23 Boundary Wall / Ground Floor Development Work
50% Complete
24 Roof Top Finishing Work
50% Complete
25 Roof Top Gardening Work
50% Complete