| SL No. | Name of The Work | Progress Details | |
|---|---|---|---|
| 1 | Foundation Work |
|
|
| 2 | Super Structure Work |
|
|
| 3 | Block Work |
|
|
| 4 | Electrical Conduiting Work |
|
|
| 5 | Door Frame Fitting Work |
|
|
| 6 | Sanitary & Plumbing Line Work (AC Drain Water Line, Verandah - Vertical Line) |
|
|
| 7 | In Side Plastering Work |
|
|
| 8 | Electrical Cable Wiring Work |
|
|
| 9 | Wall Tiles Work |
|
|
| 10 | Common Sanitary & Plumbing Line Work |
|
|
| 11 | Outside Plastering Work |
|
|
| 12 | Floor Tiles / Marble Work |
|
|
| 13 | L.C.C Work |
|
|
| 14 | Grill & Railing Work |
|
|
| 15 | Inside Paint & Polishing Work |
|
|
| 16 | Switch-Socket Fitting Work |
|
|
| 17 | Outside Paint Work |
|
|
| 18 | Door Shutter Work |
|
|
| 19 | Aluminum/Glazing Work |
|
|
| 20 | Tiles Pointing Work & Marble Finishing Work |
|
|
| 21 | Commode – Basin Fitting Work and C.P Fittings Work |
|
|
| 22 | Lift / Generator / Substation / Solar Work |
|
|
| 23 | Boundary Wall / Ground Floor Development Work |
|
|
| 24 | Roof Top Finishing Work |
|
|
| 25 | Roof Top Gardening Work |
|
|
Imperial Afaraa Garden
Expected Completion Date
Status Updated
| SL No. | Name of The Work | Progress Details | |
|---|---|---|---|
| 1 | Foundation Work |
|
|
| 2 | Super Structure Work |
|
|
| 3 | Block Work |
|
|
| 4 | Electrical Conduiting Work |
|
|
| 5 | Door Frame Fitting Work |
|
|
| 6 | Sanitary & Plumbing Line Work (AC Drain Water Line, Verandah - Vertical Line) |
|
|
| 7 | In Side Plastering Work |
|
|
| 8 | Electrical Cable Wiring Work |
|
|
| 9 | Wall Tiles Work |
|
|
| 10 | Common Sanitary & Plumbing Line Work |
|
|
| 11 | Outside Plastering Work |
|
|
| 12 | Floor Tiles / Marble Work |
|
|
| 13 | L.C.C Work |
|
|
| 14 | Grill & Railing Work |
|
|
| 15 | Inside Paint & Polishing Work |
|
|
| 16 | Switch-Socket Fitting Work |
|
|
| 17 | Outside Paint Work |
|
|
| 18 | Door Shutter Work |
|
|
| 19 | Aluminum/Glazing Work |
|
|
| 20 | Tiles Pointing Work & Marble Finishing Work |
|
|
| 21 | Commode – Basin Fitting Work and C.P Fittings Work |
|
|
| 22 | Lift / Generator / Substation / Solar Work |
|
|
| 23 | Boundary Wall / Ground Floor Development Work |
|
|
| 24 | Roof Top Finishing Work |
|
|
| 25 | Roof Top Gardening Work |
|
|
Imperial Amman Valley
Expected Completion Date
Status Updated
| SL No. | Name of The Work | Progress Details | |
|---|---|---|---|
| 1 | Foundation Work |
|
|
| 2 | Super Structure Work |
|
|
| 3 | Block Work |
|
|
| 4 | Electrical Conduiting Work |
|
|
| 5 | Door Frame Fitting Work |
|
|
| 6 | Sanitary & Plumbing Line Work (AC Drain Water Line, Verandah - Vertical Line) |
|
|
| 7 | In Side Plastering Work |
|
|
| 8 | Electrical Cable Wiring Work |
|
|
| 9 | Wall Tiles Work |
|
|
| 10 | Common Sanitary & Plumbing Line Work |
|
|
| 11 | Outside Plastering Work |
|
|
| 12 | Floor Tiles / Marble Work |
|
|
| 13 | L.C.C Work |
|
|
| 14 | Grill & Railing Work |
|
|
| 15 | Inside Paint & Polishing Work |
|
|
| 16 | Switch-Socket Fitting Work |
|
|
| 17 | Outside Paint Work |
|
|
| 18 | Door Shutter Work |
|
|
| 19 | Aluminum/Glazing Work |
|
|
| 20 | Tiles Pointing Work & Marble Finishing Work |
|
|
| 21 | Commode – Basin Fitting Work and C.P Fittings Work |
|
|
| 22 | Lift / Generator / Substation / Solar Work |
|
|
| 23 | Boundary Wall / Ground Floor Development Work |
|
|
| 24 | Roof Top Finishing Work |
|
|
| 25 | Roof Top Gardening Work |
|
|
Imperial Park View
Expected Completion Date
Status Updated
| SL No. | Name of The Work | Progress Details | |
|---|---|---|---|
| 1 | Foundation Work |
|
|
| 2 | Super Structure Work |
|
|
| 3 | Block Work |
|
|
| 4 | Electrical Conduiting Work |
|
|
| 5 | Door Frame Fitting Work |
|
|
| 6 | Sanitary & Plumbing Line Work (AC Drain Water Line, Verandah - Vertical Line) |
|
|
| 7 | In Side Plastering Work |
|
|
| 8 | Electrical Cable Wiring Work |
|
|
| 9 | Wall Tiles Work |
|
|
| 10 | Common Sanitary & Plumbing Line Work |
|
|
| 11 | Outside Plastering Work |
|
|
| 12 | Floor Tiles / Marble Work |
|
|
| 13 | L.C.C Work |
|
|
| 14 | Grill & Railing Work |
|
|
| 15 | Inside Paint & Polishing Work |
|
|
| 16 | Switch-Socket Fitting Work |
|
|
| 17 | Outside Paint Work |
|
|
| 18 | Door Shutter Work |
|
|
| 19 | Aluminum/Glazing Work |
|
|
| 20 | Tiles Pointing Work & Marble Finishing Work |
|
|
| 21 | Commode – Basin Fitting Work and C.P Fittings Work |
|
|
| 22 | Lift / Generator / Substation / Solar Work |
|
|
| 23 | Boundary Wall / Ground Floor Development Work |
|
|
| 24 | Roof Top Finishing Work |
|
|
| 25 | Roof Top Gardening Work |
|
|
Imperial Mohua
Expected Completion Date
Status Updated
| SL No. | Name of The Work | Progress Details | |
|---|---|---|---|
| 1 | Foundation Work |
|
|
| 2 | Super Structure Work |
|
|
| 3 | Block Work |
|
|
| 4 | Electrical Conduiting Work |
|
|
| 5 | Door Frame Fitting Work |
|
|
| 6 | Sanitary & Plumbing Line Work (AC Drain Water Line, Verandah - Vertical Line) |
|
|
| 7 | In Side Plastering Work |
|
|
| 8 | Electrical Cable Wiring Work |
|
|
| 9 | Wall Tiles Work |
|
|
| 10 | Common Sanitary & Plumbing Line Work |
|
|
| 11 | Outside Plastering Work |
|
|
| 12 | Floor Tiles / Marble Work |
|
|
| 13 | L.C.C Work |
|
|
| 14 | Grill & Railing Work |
|
|
| 15 | Inside Paint & Polishing Work |
|
|
| 16 | Switch-Socket Fitting Work |
|
|
| 17 | Outside Paint Work |
|
|
| 18 | Door Shutter Work |
|
|
| 19 | Aluminum/Glazing Work |
|
|
| 20 | Tiles Pointing Work & Marble Finishing Work |
|
|
| 21 | Commode – Basin Fitting Work and C.P Fittings Work |
|
|
| 22 | Lift / Generator / Substation / Solar Work |
|
|
| 23 | Boundary Wall / Ground Floor Development Work |
|
|
| 24 | Roof Top Finishing Work |
|
|
| 25 | Roof Top Gardening Work |
|
|